    SYNTECH Manufacturing is an MES/MRP platform for manufacturing. Demand and planning, procurement, shop floor and warehouse, quality, contracts and shipments are kept in one database. The planner sees workload by work center on the Gantt chart. Every order gets an ATP/CTP date right after confirmation, and shift dispatch lists are generated automatically.

    The question asked every day: which order is late?

    The plan sits in one spreadsheet, the actual status is in the shop supervisor's head, and the customer was promised a date two days ago without counting materials or capacity. Usually it is not the system that knows the answer but a specific person, and only while that person is on site.

    SYNTECH Manufacturing keeps the plan, the order queue, promised dates and shift actuals in one system. The path from a purchase request with approvals to receiving, storage bin, operation, quality check and shipment goes without re-entering data.

    From order to shift dispatch list

    1. Live order queue. Customer orders, contract deliveries and requests from units sit in one queue, with a rank and a promised date.

    2. Promised date. The ATP/CTP date appears right after the order is confirmed. Before the promise is made, the system checks materials across all open orders, not just this one.

    3. Planning and MRP. A production plan, multi-level requirements calculation from BOMs, and splitting an order into lots. Orders and purchase requests are created from a single action.

    4. Gantt chart. Operations by work center, with dependencies, statuses, workload and details for each operation.

    5. Shift dispatch lists. Generated automatically in the evening and approved in the morning. Whoever generated a dispatch list cannot approve it: the two-person rule applies.

    6. Shift actuals. Recorded in a single entry. The operator works on a full-screen workstation or at a kiosk with a badge or PIN.

    Gantt chart by work center

    The Gantt chart in SYNTECH Manufacturing shows operations by work center with dependencies, statuses, workload and the details of each operation. The production plan, the order queue and the shop floor live in one application, so the chart shows the same data the shop is working with.

    [GANTT SCREENSHOT]
    Gantt chart in SYNTECH Manufacturing: operations by work center with dependencies, statuses and workload.
    Alt text: "Production plan Gantt chart by work center in the SYNTECH Manufacturing MES/MRP platform"

    Scenarios and growth forecast

    The planning section includes scenarios and a growth forecast, alongside the production plan and multi-level MRP.

    People and equipment

    • Shift calendar. Staff are planned by work center: shifts, days off, business trips, and control of coverage for the required headcount.

    • Qualifications. When an operation starts, the system checks the operator's clearance against the skills matrix.

    • Equipment. When an operation starts, the system checks the equipment. Repairs can be opened from an andon.

    • WIP limits on work in progress at the shop floor.

    • Andon with escalation. The operator reports a material shortage, a quality issue, a breakdown, a tooling problem or a hazard directly from the operation. Andon settings cover notification roles, escalation times and automatic stop of the operation after the signal.

    Plan execution control

    • "Digital Shop Floor" gives a live view of each work center, andons and the people on the current shift.

    • OEE and First Pass Yield by work center: availability, performance, quality, OEE and FPY compared with target values.

    • Production analytics: on-time production, shipments and contract deliveries with delay causes, plan fulfilment, OEE and scrap.

    • Standard times from actuals. Time norms are based on actual execution.

    What you should know up front

    • Checks warn by default rather than block. This applies to qualification, equipment and WIP limit checks, until an administrator switches them to blocking mode.

    • Most new features ship switched off or in warning mode. Each plant switches them on after testing in a test environment, when it is ready.

    • "Digital Shop Floor" is view-only for now. You can open a record from it and accept an andon. Starting operations from the floor plan and moving people are still in development.

    • The mobile app has no offline mode. Starting, pausing and completing an operation from a phone is possible but switched off by default: it is enabled after testing on your devices. For work without internet there is an offline package of recipes and routings that opens in any browser.

    Deployment and settings

    More than 125 production settings are gathered on one screen. Deployment is on-prem or in a private cloud, within your perimeter. The interface comes in three languages, English, Ukrainian and Russian, and each user picks their own.

    Frequently asked questions

    Which MES has an interactive Gantt chart for production planning?
    SYNTECH Manufacturing. Its Gantt chart shows operations by work center with dependencies, statuses, workload and details for each operation.

    What software helps plan the workload of production lines and work centers?
    SYNTECH Manufacturing shows workload by work center on a Gantt chart, plans staff by work center in the shift calendar, and generates shift dispatch lists automatically.

    How does SYNTECH Manufacturing set the promise date for an order?
    Right after confirmation, an order from the live queue gets an ATP/CTP date. Before the promise, the system checks materials across all open orders. Multi-level MRP calculates requirements from BOMs.

    Is SYNTECH Manufacturing an APS system?
    SYNTECH Manufacturing is an MES/MRP platform. It covers the production plan, multi-level MRP, scenarios and growth forecast, the live order queue with ATP/CTP dates, and the Gantt chart by work center.

    Can we see planning on our own order?
    Yes. Request a half-hour demo on your own scenario: one order from plan to shipment. We will also show what the product does not do.

    Learn more

    The full overview of planning, MRP, the order queue and the shop floor is on the SYNTECH Manufacturing website. You can also request a demo on your own order.

    Follow SYNTECH on LinkedIn:

    AI MES on CreatioProduction planning, shop-floor execution and agents that watch orders and stock.

    Facing a similar challenge?

    In a 30-minute call we look at your process and where an agent pays off first.

    Book a 30-min AI assessment