Which order is late?
The plan is in a spreadsheet, the actual status is in the supervisor’s head, and the promised date was set without checking material and capacity.

Syntech Manufacturing is an MES/MRP application on Creatio: demand and plan, shop floor and warehouse, quality, contracts and shipment in one database. The defence contour — state contracts, military acceptance, NATO codification and export licences — sits inside the product, in your perimeter.
The customer, military representative, licence auditor and finance director ask about the same things: dates, product composition, revision, documents and shipment permission.
The plan is in a spreadsheet, the actual status is in the supervisor’s head, and the promised date was set without checking material and capacity.
Component batches, supplier certificates, operations, operators and quality checks have to be reconstructed from delivery notes and memory.
Engineering released a change, the route at the workstation stayed old, and no one can say which serial number started the new revision.
Sales, contracts, production, warehouse, quality and cost sit in one Creatio database. No connector between CRM and MES, no nightly sync, no second item master.
The order queue, delivery schedule, MRP calculation and shop-floor tasks are connected without duplication.
A scan shows the BOM revision, component batches, certificates, operations, inspection, acceptance act and shipment.
Fields, pages, rights, processes and reports are configured low-code in Creatio, not as a separate development project.
Launch priority modules step by step or build one connected manufacturing loop from demand to shipment.
Production plan, requirements exploded through BOMs, production orders and purchase requests in one calculation.
One ranked queue of sales orders, contract deliveries and unit requests with ATP/CTP dates and reason chains.
BOMs and routings under revision control, ECN, operator tech maps, CAD/PDM import and NATO codification.
Operator workstation, shift assignments, andon signals, work-centre monitor, OEE and shift actuals.
Equipment passports, preventive maintenance, repair orders from andon, measuring instruments under calibration control.
Qualification matrix checked at operation start, staff reservation, time tracking, piece-rate and hourly pay.
Incoming, in-process and final inspection, non-conformances, CAPA, 8D and printed test protocols.
Search by batch or serial in both directions, quality holds, recalls and the electronic product dossier.
State contract, delivery schedule, advances, military-representative acts and archive of acceptance documents.
Licences with quantity and value usage, end-user screening, end-use certificates and a check before issue.
Bin storage, batches and serials, FEFO/FIFO, issues against an order, transfers and labels.
Purchase requests from MRP and the shop floor, role approvals, receiving with supplier batch, certificate and incoming inspection.
Manufacturing settings, roles and approvers, background jobs, manufacturing log and seven mobile workplaces.
Work-center load, critical path, dependencies and drag-and-drop operations.

Availability, operation queue, utilization and efficiency for every work center.

Order status, plan versus actual, availability, performance and quality on one screen.

A customer order, contract delivery or unit request becomes a queue, plan, production tasks, quality control and shipment without manual hand-off between systems.
Demand
Queue
MRP
Production
Inspection
Shipment

For drone, electronics and equipment makers, the system connects R&D, the line, warehouse, quality, state contract, military acceptance, NATO codification and export control.
From a serial number down to component batches and supplier certificates; from the serial number up to the customer, contract and act.
BOM and routing revisions, ECN and current operator instructions do not get lost in email and paper.
Test protocols, acceptance acts, certificates, licences and labels are linked to the batch or serial number.
On-premise or private cloud, roles, SSO, 2FA, change logs and isolation by contract or project.
Creatio has ISO/IEC 27001:2022, ISO 9001:2015, SOC 2 Type II and ISO/IEC 27017/27018 for the relevant scopes. But your system’s compliance is assessed by the system owner after deployment and configuration.

A process map, risk questions and priority for the first module.
Launch the selected manufacturing loop on live data with a measurable result.
Adjacent modules, integrations, roles, administrator and user training.
In 30 minutes, we walk through one scenario: from plan to shipment or from a serial number to the acceptance act.