MESWhat Software to Use If UAV Design and BOM Change Frequently?
How to manage new UAV versions, component substitutions, and the actual configuration of each product.
Sales & CRM automation
Pipeline, customers, operations and analytics driven by processes, not spreadsheets.
Today, UAVs are assembled according to one bill of materials. Next week, engineers update the design, and the procurement department announces the need to replace one of the components.
Some units are already on the assembly line. Others are still waiting to be launched.
And questions arise: which BOM should be used, can an alternative component be installed, and how do you later determine which design a specific UAV was built to?
For manufacturing with frequent design changes, it is worth using an MES/MRP platform with BOM revision management, engineering change notices (ECN), approved substitutes, and serial traceability.
These capabilities are supported by Syntech Manufacturing - MES/MRP platform.
Why a Regular BOM Is Not Enough
A BOM (Bill of Materials) describes the product structure: subassemblies, parts, materials, and their quantities.
However, for a UAV manufacturer, it is essential to know not only what should be included in the design.
It is also necessary to understand:
which revision is currently effective;
which components are approved for substitution;
which production orders are using the previous version;
what actual components a specific product was assembled from.
If this data is stored in disparate spreadsheets, controlling changes becomes significantly more difficult.
How Syntech Manufacturing Helps Manage BOM Changes
Revisions Instead of Overwriting Bills of Materials
In Syntech Manufacturing, bills of materials and routing operations have revisions.
When a design changes, a new version is created with Draft status. The previous approved version remains in the history.
Revisions can be compared side-by-side to see added, removed, and modified items.
Once released, the new revision becomes effective, and the previous one receives Superseded status.
This allows you to control the design change history and work with approved specifications.
ECN for Change Approval
A design change must have a reason and a defined effective point.
In Syntech Manufacturing, an ECN (Engineering Change Notice) is used for this purpose.
It contains the reason, description, effective date, and the starting serial number from which the change takes effect.
Approval by the chief process engineer is provided.
The platform also displays open production orders that remain on the previous revision.
This is important because a new version does not automatically change already open orders retroactively.
Approved Component Substitutes
Sometimes the design does not change completely, but an alternative component must be used.
For example, a supplier cannot deliver the required part on time.
Syntech Manufacturing provides approved substitutes and product variants.
Alternative components are defined in engineering data. Actual substitutions can be tracked by serial numbers with the specified rationale.
This preserves the configuration history of each individual product.
It is important that a substitute is pre-defined as approved rather than chosen arbitrarily during production.
"As-Designed vs. As-Built" Reconciliation
One of the essential tools for UAV manufacturers is comparing the planned design with the actual one.
In Syntech Manufacturing, "as-designed / as-built" reconciliation shows the active revision and the reasons for component substitutions.
This makes it possible to verify how the actual build of a specific UAV aligns with the approved specification.
How It Works in UAV Manufacturing
Let's consider a hypothetical scenario.
An enterprise is assembling a batch of UAVs. During order execution, engineers approve a change to one of the electronic components.
A new BOM revision is created in Syntech Manufacturing.
The change undergoes approval via an ECN. An effective date and starting serial number are defined for it.
The platform displays open orders that remain on the old revision.
New production orders use the active revision of the BOM, while already open orders keep the revision they were originally scheduled for.
After assembly, by using the UAV's serial number, you can view the revision, component batches used, and related production data.
Thus, design changes remain tied to the actual manufacturing history.
How Frequent BOM Changes Affect Procurement
A change in specification may mean new material requirements.
Therefore, revision management must be linked to MRP.
Syntech Manufacturing supports multi-level material requirements planning based on BOMs and the generation of purchase requests.
New production orders and MRP use the active revision. Open orders retain their version.
This approach allows engineering changes to be aligned with production planning without automatically altering orders that have already been launched.
Read more about material calculations and working with substitutions in the article "How MRP Detects Component Shortages Before Launch and Enables Substitutes".
When an MES/MRP Platform Is Needed
Moving from spreadsheets to a manufacturing system is worth considering if:
the UAV design changes regularly;
products are manufactured concurrently across multiple revisions;
alternative components are used;
actual builds need to be controlled;
the history of each serialized product must be tracked.
Under such conditions, BOM management becomes an integral part of managing the entire production process.
Conclusion
Frequent design changes should not result in constant confusion between R&D, procurement, and the shop floor.
To prevent this, it is essential to retain revisions, approve engineering changes, and track the actual components of each product.
Syntech Manufacturing is an MES/MRP platform that unifies BOM management, ECNs, approved substitutes, MRP, and serial traceability.
During a demo, you can see how a new revision is created, which production orders it affects, and how the system preserves the history of the finished product.
Learn more about Syntech Manufacturing for defense production
Request a Syntech Manufacturing demo
Frequently Asked Questions
What software is suitable for frequent BOM changes?
Syntech Manufacturing supports BOM revisions, ECNs, approved component substitutes, and control over actual product configuration.
Can alternative components be used?
Yes. The platform supports pre-defined approved substitutes and tracks actually used components by serial numbers.
How do you determine which BOM a UAV was built to?
By using the serial number, you can view the BOM revision, component batches used, and related production data.
Does the revision of already open orders change?
No. Open orders keep their revision. A new version is not applied to them automatically retroactively.
Can you see which orders are affected by a new revision?
Yes. Syntech Manufacturing includes an "Affected Orders" tab that displays open production orders remaining on the previous revision.
Next step
Get a 30-minute automation assessment
15–30 minutes, no slide decks: we show the solution on your data and tell you if it fits.