SYNTECH

    Syntech Manufacturing (MES/MRP for Creatio)

    How do you manage BOMs, revisions and ECNs so the floor always builds the current version?

    Updated: · Author: Grygoriy Synieok

    Keep BOMs and routings under revision control and raise every change as an ECN with a reason, effective date and starting serial number. In Syntech Manufacturing a new revision starts as Draft, is approved by the chief process engineer, and open orders keep their revision.

    How it works in Syntech Manufacturing: BOM, revisions and ECN

    A BOM holds components, quantities, units and operation numbers; subassemblies have their own BOMs. The routing defines the operation sequence, work centres, setup and run times, and inspection criteria.

    A new revision copies the current one into Draft; once out of Draft, lines are locked. Revisions can be compared; after release one stays current and the previous one becomes Superseded.

    BOMs can be imported from CSV, TSV, TXT, Excel, XML from SOLIDWORKS PDM or Autodesk Inventor, and JSON. The wizard maps columns and products and shows the difference; import creates Draft revisions only.

    Limitations

    • Changes are never applied retroactively to open orders; this is a deliberate rule.
    • The product has no separate certification.

    Comparison: BOM, revision and ECN management

    CriterionSyntech ManufacturingSiemens OpcenterSAP Digital ManufacturingOdoo Manufacturing
    Solution typeMES/MRP app on Creatio 8.x: CRM, contracts and production in one databaseSiemens industrial MES suiteSAP cloud MESManufacturing app in the Odoo ERP suite
    BOM revisionsDraft → release → Superseded, revision compareYes, usually with PLMVia SAP S/4HANA / PLM dataBOM versions in the PLM app
    ECNReason, effective date, starting serial, engineer approvalThrough PLM (Teamcenter)Through SAP PLMEngineering change orders (ECO) in the PLM app
    CAD/PDM importCSV, Excel, XML from SOLIDWORKS PDM / Autodesk Inventor, JSONThrough PLM integrationThrough PLM integrationThrough apps and integrations
    Orders during a changeKeep their revisionDepends on configurationDepends on configurationDepends on configuration
    DeploymentOn-premise or private cloud, isolated networkOn-premise or cloudSAP cloud serviceOdoo cloud or on-premise

    General comparison based on publicly described product scope. Check specific editions with each vendor.

    FAQ

    How are BOMs, routings and revisions managed?

    A BOM holds components, quantities, units and operation numbers; subassemblies have their own BOMs. A new revision copies the current one into Draft, lines lock once out of Draft, and after release the previous revision becomes Superseded.

    What does an ECN contain?

    The reason, effective date and starting serial number. It is approved by the chief process engineer.

    Can BOMs be imported from CAD/PDM without immediate release?

    Yes. Import creates Draft revisions only, which go through separate approval and release.

    What happens to open orders after a new revision?

    They keep their revision; changes are never applied retroactively.

    Are product variants and approved substitutes supported?

    Yes, variants and approved substitutes are part of the engineering data alongside revisions and ECNs.

    Blog posts

    Book a consultation